New Paragraph
RLS-CMC Wireless successfully completed the IDAS installation of the City Center campus including the Aria Tower and low-rise, the Vdara Tower and low-rise, the casino floor, all convention spaces, and back-of-house areas. To provide coverage to the nearly 9 million square feet of space, RLS installed over 3,500 antennas, 275,000 feet of coaxial cable, and 70,000 feet of fiber optic cable. To accommodate the extensive infrastructure, more than 2,100 access panels were installed and over 7,000 ceiling cuts were made and patched with Level 5 finishes. RLS effectively coordinated material delivery and distribution to multiple subcontractors while managing 11 subcontractors across 8 trades to complete the project within a compressed timeline, ahead of major Las Vegas events such as the Super Bowl and the inaugural F1 race.
3720 Las Vegas Blvd., Las Vegas, NV 89158
New Paragraph