Sheraton Phoenix Downtown

RLS-CMC, Inc. acted as Contractor on this iDAS installation. RLS-CMC, Inc. surveyed the complete site, 1,200,000 square ft and over 30 stories tall, converted 2 roof top mechanical rooms into head end rooms with new power coming from the lower level, installed a centeralized UPS system for head end and all remote locations. This project consisted of 42 remotes and 384 antennas and new ½’ coax to all antennas running back to each remote. New fiber backbone was installed from building MPOE up to head end room in rooftop penthouse and from head rooms down to each IDF closet, a total of 13.

 

Location

340 N 3rd Street · Phoenix, AZ 85004