SLS Hotel & Casino

RLS-CMC, Inc. acted as Construction Manager and Owner’s Representative for the IDAS installation of the SLS Hotel and Casino level. RLS-CMC, Inc. provided pre-construction, design, engineering, and management services to successfully complete the installation of the new Las Vegas casino. The DAS project took place, simultaneously, with the new construction of the building. The project included 900 antennas distributed throughout the casino, pool areas, and hotel floors. The antennas were amplified from the 37 remote unit locations and connected to the newly constructed head end, located on-site. The RLS-CMC team was able to coordinate with all trades during the construction period and complete all activities before the grand opening of the casino.